Sunday, January 23, 2005

Plumbing almost complete

Putting the Plumbing Plan to work. Water flows from all tanks to a Sump. The design, height of entry into the sump will prevent tanks from emptying if an issue occurs. The design does allow for individual, selected tanks or all tanks to be completely drained.

Thursday, January 20, 2005

Technology Assists Efficient Running of the ARC



A WiFi connection has been made between the school and the ARC. This will facilitate access to the schools network, Intranet, Internet, files to record results of water tests and eventually 'WetCam' monitoring of the ARC and Tanks.

Thursday, January 13, 2005

A ROW of TANKS


The Tank Structure begins to take shape.