Thanks to
Cameron and Jarryd for trimming the overhanging branches. The path to the ARC was beginning to be a jungle. Secators were used to remove some very think branches.
The Chrysanthemum Gardens were weeded by 'most' of the class. Some decided that bending and dirt 'are not their thing'!
Ben and Jaime assisted in moving the pool hose, that was draining the sump to ensure the whole of garden (1) was watered.
The outside reservoir had thick sludge on the bottom, by backwashing the ARC recirculation system to the reservoir while maintaining flow through the pool hose to the garden we were able to move the sludge.
The Worm Farm has progressed 'layer apon layer' and is now ready for worms, thanks to
Daniel (Smida) for his leadership. A local resturant has been organised to drop off left overs for the farm.
I am concerned that the following groups will not complete the project (Assessment Task)... this will result in a FAILURE... Please see me if you would like guidance.
- Frog Tank progressing- NO Frogs.
- Marine/Salt Water Tank-NO Progress
- Brine Shrimp/Artemia- NO Progress
- Cichlid Breeding -NO Progress
Come on guys and gals... running out of time!